Roadmap
-
Construct valid atom:feed documents for every useful entry point and index group in IAph2007. These atom:feed documents should also be valid ORE Resource Maps and, where appropriate, be accompanied by links to Pleiades to provide geographic relevance.
-
Clean up BSR-owned HTML version (adding commentary from book, bibliography from EDH/PHI, Greek) and convert programmatically to EpiDoc? XML in preparation for hand work, checking and cleanup.
-
Milestone: Six-month Report (JISC)
Due in 5 days (09/01/08)
JISC requires a six-month "brief" progress report by this date. This should be written from an overall project perspective, incorporating the work packages of both teams.
-
Milestone: Feeds for DDBDP/HGV
Due in 1 month (10/01/08)
-
Milestone: Semi-annual performance report (NEH)
Due in 2 months (10/31/08)
This report must cover the period 1 April - 30 September 2008.
-
Milestone: Feeds for IRCyr
Due in 4 months (12/15/08)
-
A final, tidied version of the XML, creating a full "reprint", corrected but not updated, of the 1952 Reynolds volume.
-
Creating a findspot database for IRCyr and IRT
-
Milestone: Feeds for IRT
Due in 6 months (02/15/09)
-
Milestone: Final Report (JISC)
Due in 7 months (04/01/09)
JISC requires a final report by this date. This should be written from an overall project perspective, incorporating the work packages of both teams.
-
Milestone: Final Reports (NEH)
Due in 10 months (06/30/09)
Final reporting requirements (NEH) for this project include:
- Final Financial Report (covering the period: 1 April 2008 - 31 March 2009)
- Final Performance Report (covering the period: 1 April 2008 - 31 March 2009)
- White Paper (addressed to a public audience that describes "how the project was conducted and indicate[s] where the proposed plan succeeded and where it failed. This paper will be posted on the NEH Web site so citizens can benefit from the experience of grantees."